Decision record
Reward Communities That Build Quality Homes
Outcome
A result has not been recorded for the ballot.
Voted wording
- Revision ID
legacy-c3189517d7227762b1da3c94dd9ce56e20cb5fe717a9fd29ee01100aee4ff0e5- Content hash
a6a11aebaee9c6aef735fcbc717b2c27e0752a62453a2cd298b86cf32594b163- Recorded
- 27 Oct 2026
Reward Communities That Build Quality Homes
Establish a Commonwealth Housing Delivery Accelerator that pays councils lump-sum bonuses for completed homes delivered in priority catchments under the minimum permission standard and code-complying pathway, with payments triggered only on verified completion.
Outcomes
- Councils will gain a direct financial incentive to approve housing that meets clear standards.
- Local services and infrastructure will improve as housing growth generates dedicated funding streams.
- Community confidence will rise as growth is paired with visible upgrades rather than unfunded strain.
- Housing delivery will accelerate as council decision-making is aligned with measurable outcomes.
- Councils will be better equipped to invest in planning capability, compliance, and enforcement.
- State planning reforms will become harder to quietly undermine as delivery outcomes are publicly measured and rewarded.
- Land hoarding will lose leverage as the system rewards actual delivery rather than delay and scarcity.
Design rationale
Councils are resource-constrained while carrying responsibility for approvals, local infrastructure interfaces, and enforcement. A completion-triggered Housing Delivery Accelerator aligns council incentives with actual delivery rather than approvals or intentions, while providing funding that scales predictably with growth. Payments are structured around measurable housing outcomes and objective standards, encouraging durable, well-located, and broadly usable housing types without introducing aesthetic discretion or subjective design judgement.
Base payment structure
- A fixed base payment applies per verified completed dwelling.
- Payment is triggered only upon issuance of an occupancy certificate or equivalent completion certification.
- Payments are indexed to construction cost inflation to preserve incentive strength over time.
Quality uplift tiers (objective criteria only)
Additional uplifts apply where a completed dwelling meets published, measurable standards:
- Family-capable dwelling uplift — applied to dwellings meeting defined bedroom and minimum internal area thresholds (e.g. 2+ bedrooms with specified floor area).
- Transport-priority uplift — applied to dwellings delivered within defined rail station catchments, activity centres, or frequent public transport corridors.
- Durability uplift — applied to buildings meeting defined structural durability and energy efficiency classifications.
- Mixed-use integration uplift — applied where residential dwellings are delivered above active ground-floor commercial or community uses within designated centre zones.
All uplift thresholds must be numeric, published, and compliance-verifiable. Discretionary qualitative assessments are not permitted.
Anti-distortion safeguards
- Uplifts must not exceed a defined proportion of the base payment to avoid discouraging smaller or entry-level dwellings.
- Micro-dwellings below defined minimum habitable standards do not qualify for uplift tiers.
- Artificial subdivision of large dwellings to multiply base payments is excluded through minimum size standards.
- Councils may not impose additional approval barriers to favour uplift-eligible projects.
Equity and geographic balance
- Payment rates may vary by regional cost band to reflect construction cost differences across Australia.
- Regional and metropolitan jurisdictions are eligible under the same structural criteria.
Audit and compliance
- All payments are tied to geospatial and certification data.
- Public reporting discloses council-level completions, uplift category breakdowns, and total accelerator payments.
- Misclassification or manipulation triggers repayment and temporary disqualification.
Interaction with other reforms
Minimum Housing Permissions expand legal capacity; the Fast-Track reduces approval risk; the Accelerator aligns council incentives with actual completed housing outcomes.
Risk and failure modes
Risks include over-concentration in specific dwelling types, gaming of bedroom classifications, or uplift capture without genuine livability gains. Periodic review of objective criteria ensures incentives remain aligned with housing system performance.
Implementation outline
Federal legislation defines payment amounts, uplift criteria, indexing method, and reporting requirements. States and councils participate through automatic eligibility upon compliance with minimum permission and fast-track reforms.
Policy Lineage
- No specific pre-existing Fusion policy, submission, or statement.
Values Alignment
- Principle: Sustainable Urban Prosperity — Sharing development benefits with communities supports infrastructure and better planned growth.
- Value: Equity — Completion-based payments return some of the benefits of housing growth to the communities accommodating it.
Ballot and result
- Ballot ID
proposal:POL-016- Purpose
- Decision on this proposal
- Electorate
- Party-wide
- Status
- Open
- Wording
legacy-c3189517d7227762b1da3c94dd9ce56e20cb5fe717a9fd29ee01100aee4ff0e5Bound to voted wording- Closes
- 8 Dec 2026, 6:00 pm
The ballot has not been certified, so there is no recorded result.
Amendments
No amendments were filed.
Revision history
| Revision | Recorded | Content hash | Note |
|---|---|---|---|
Original recorded wording · 27 Oct 2026legacy-c3189517d7227762b1da3c94dd9ce56e20cb5fe717a9fd29ee01100aee4ff0e5 | 27 Oct 2026 | a6a11aebaee9c6aef735fcbc717b2c27e0752a62453a2cd298b86cf32594b163 | Ballot wording |
Publication
No policy record exists for this proposal, so nothing has been ratified or published.