Reward Communities That Build Quality Homes
Establish a Commonwealth Housing Delivery Accelerator that pays councils lump-sum bonuses for completed homes delivered in priority catchments under the minimum permission standard and code-complying pathway, with payments triggered only on verified completion.
- Proposed by
- Fusion Working Group
- Applies to
- Fusion NationalAuthority: Fusion National
- Ballot wording
- Original recorded wording · 27 Oct 20269 ballots cast · 0 contributions
- Policy Registry
- Not yet adoptedUpdated
Key commitments
Councils will gain a direct financial incentive to approve housing that meets clear standards.
Local services and infrastructure will improve as housing growth generates dedicated funding streams.
Community confidence will rise as growth is paired with visible upgrades rather than unfunded strain.
Housing delivery will accelerate as council decision-making is aligned with measurable outcomes.
Councils will be better equipped to invest in planning capability, compliance, and enforcement.
State planning reforms will become harder to quietly undermine as delivery outcomes are publicly measured and rewarded.
Land hoarding will lose leverage as the system rewards actual delivery rather than delay and scarcity.
Rationale & background
Rationale & background
Design rationale
Councils are resource-constrained while carrying responsibility for approvals, local infrastructure interfaces, and enforcement. A completion-triggered Housing Delivery Accelerator aligns council incentives with actual delivery rather than approvals or intentions, while providing funding that scales predictably with growth. Payments are structured around measurable housing outcomes and objective standards, encouraging durable, well-located, and broadly usable housing types without introducing aesthetic discretion or subjective design judgement.
Base payment structure
- A fixed base payment applies per verified completed dwelling.
- Payment is triggered only upon issuance of an occupancy certificate or equivalent completion certification.
- Payments are indexed to construction cost inflation to preserve incentive strength over time.
Quality uplift tiers (objective criteria only)
Additional uplifts apply where a completed dwelling meets published, measurable standards:
- Family-capable dwelling uplift — applied to dwellings meeting defined bedroom and minimum internal area thresholds (e.g. 2+ bedrooms with specified floor area).
- Transport-priority uplift — applied to dwellings delivered within defined rail station catchments, activity centres, or frequent public transport corridors.
- Durability uplift — applied to buildings meeting defined structural durability and energy efficiency classifications.
- Mixed-use integration uplift — applied where residential dwellings are delivered above active ground-floor commercial or community uses within designated centre zones.
All uplift thresholds must be numeric, published, and compliance-verifiable. Discretionary qualitative assessments are not permitted.
Anti-distortion safeguards
- Uplifts must not exceed a defined proportion of the base payment to avoid discouraging smaller or entry-level dwellings.
- Micro-dwellings below defined minimum habitable standards do not qualify for uplift tiers.
- Artificial subdivision of large dwellings to multiply base payments is excluded through minimum size standards.
- Councils may not impose additional approval barriers to favour uplift-eligible projects.
Equity and geographic balance
- Payment rates may vary by regional cost band to reflect construction cost differences across Australia.
- Regional and metropolitan jurisdictions are eligible under the same structural criteria.
Audit and compliance
- All payments are tied to geospatial and certification data.
- Public reporting discloses council-level completions, uplift category breakdowns, and total accelerator payments.
- Misclassification or manipulation triggers repayment and temporary disqualification.
Interaction with other reforms
Minimum Housing Permissions expand legal capacity; the Fast-Track reduces approval risk; the Accelerator aligns council incentives with actual completed housing outcomes.
Risk and failure modes
Risks include over-concentration in specific dwelling types, gaming of bedroom classifications, or uplift capture without genuine livability gains. Periodic review of objective criteria ensures incentives remain aligned with housing system performance.
Implementation outline
Federal legislation defines payment amounts, uplift criteria, indexing method, and reporting requirements. States and councils participate through automatic eligibility upon compliance with minimum permission and fast-track reforms.
Member ballot
What you’re deciding
Establish a Commonwealth Housing Delivery Accelerator that pays councils lump-sum bonuses for completed homes delivered in priority catchments under the minimum permission standard and code-complying pathway, with payments triggered only on verified completion.
Review commitmentsBallot record
Wording: Original recorded wording · 27 Oct 2026
How many people need to vote?
Quorum metEngage needs at least 30 eligible registered members before its ballots can make decisions. Each ballot also needs enough people to take part.
- Eligible registered members
- 37 · platform quorum met
- Recently active members
- 14 in the last 90 days
- Participants needed
- 7
- Votes recorded so far
- 9 of 7 needed
You can vote for, vote against or abstain. All three count towards participation. The final calculation happens when voting closes, so the number needed can change as members become active or inactive.
9 votes have been recorded. Sign in to vote if you are eligible.
Your vote is identifiable to national administrators and authorised national ballot reviewers. Aggregate results are public; a very small ballot may reveal individual choices. Privacy Policy
Formal amendments
0Suggest exact changes to a title, summary, commitment or rationale paragraph. Voting on an amendment is separate from voting on the main proposal.
No formal amendments have been proposed yet.
Discussion
0 contributionsShare evidence, ask a question or suggest an improvement. Discussion scores do not count as ballot votes.
Verified members can sign in to comment or vote on contributions.
No contributions yet. Verified members can start the discussion using the form above.
Wording history and sources
1 snapshotSee how the wording has changed and which version was put to a ballot. References below provide background; they do not by themselves establish prior adoption.
- Original recorded wording · 27 Oct 2026
legacy-cLatestBallot wording
Policy background and sources
References to earlier policy and notes about what is known of its history.
Explicitly recorded in the AGM Round 1 lineage notes as having no pre-existing approved Fusion policy, submission, or statement.
Prior policy predecessors
- No specific pre-existing Fusion policy, submission, or statement.
Values & principles alignment
- Principle: *Sustainable Urban Prosperity* — Sharing development benefits with communities supports infrastructure and better planned growth.
- Value: *Equity* — Completion-based payments return some of the benefits of housing growth to the communities accommodating it.