Make More From What We Mine

Build an advanced zirconium and hafnium processing industry at Portland for high-value refining, using shared infrastructure and a strategic-processing-node model that can be applied to other mineral value chains.

Taking partVerified members can comment or propose an amendment. Sign in to take part.
  1. Idea
  2. Discussion
  3. Voting
  4. Implementation

Read the discussion, raise a concern, or suggest a wording change before voting begins.

Proposed by
Fusion Working Group
Applies to
Fusion NationalAuthority: Fusion National
Ballot wording
Draft wording (no ballot yet)0 ballots cast · 0 contributions
Policy Registry
Not yet adoptedUpdated

Key commitments

6 commitments
  1. More skilled jobs will be created in advanced minerals processing and manufacturing.

  2. New opportunities for processing and manufacturing businesses will be created in strategic locations.

  3. Australian mineral producers will gain more domestic pathways into higher-value processing.

  4. Australian manufacturers will gain stronger access to strategically important zirconium and hafnium materials.

  5. Regional economies will become more attractive locations for future high-value industry.

  6. Australia will retain more of the value created from its mineral resources.

Rationale & background

Rationale & background

Design rationale

Australia has the world's largest identified economic resources of zircon and is one of the world's largest producers, but much of the higher-value zirconium and hafnium processing chain remains offshore.

Western Victoria is also developing a substantial new mineral-sands industry. The approved Donald project will mine and process 7.5 million tonnes of mineral sands annually and transport its products to the Port of Portland, while the proposed Avonbank project would also transport mineral-sands products to Portland.

We would use this emerging mineral flow to build downstream processing at Portland rather than treating the port solely as an export point.

Portland processing node

Portland combines an emerging regional mineral-sands supply with Victoria's only naturally deep-water commercial port, existing mineral-sands storage, national road and standard-gauge rail connections, an established aluminium-smelting industry, major electricity infrastructure, and substantial land suitable for additional heavy industry.

Federal and Victorian co-investment would focus on shared infrastructure needed to establish and expand the processing node, including electricity, water, freight, port capacity, and common industrial services where these are shared constraints rather than requirements of a single plant.

Existing Victorian supply chains could provide bulk chemicals and other process inputs where local production is unnecessary. Portland is connected through the national standard-gauge freight network to metropolitan intermodal facilities, allowing specialised inputs to be brought into the precinct without requiring every supporting industry to be co-located there.

Additional industrial water demand would be supplied without relying on municipal water required by the surrounding community. Open-ocean desalination could provide additional supply where required, with its capital and electricity requirements incorporated into the economics of the processing node.

Public investment in shared infrastructure would favour assets that remain useful to multiple processors or future industries rather than bespoke infrastructure whose value depends on the continued operation of a single company.

Zirconium and hafnium processing

Processing at Portland would include mineral separation and zirconium-hafnium separation, creating a local pathway from Victorian mineral sands into high-value refined products.

Australia already has substantial technical capability in zirconium and hafnium separation. ANSTO has undertaken extensive process and pilot-scale development covering zirconium and hafnium separation, zirconium compounds, zirconia, and high-purity separated zirconium and hafnium products.

The objective is to extend Australian production beyond separated compounds into zirconium and hafnium metals, alloys, and other advanced materials. Expansion into these downstream stages would proceed as the required technology, customer qualification, and commercial demand are established.

Western Victorian mineral sands would provide the regional feedstock base, while Portland could also accept suitable zirconium and hafnium intermediates from elsewhere in Australia. This would allow upstream producers to specialise in the processing stages suited to their operations while supporting a broader domestic downstream industry.

Strategic processing nodes

Portland would demonstrate a broader model for identifying where Australian minerals should move to their next stage of processing.

Strategic processing nodes would be selected according to the economics of each processing stage, including freight flows, material value and volume, energy and water requirements, reagent supply, waste management, industrial land, workforce, port access, and customer markets.

Where a node meets this test, we would co-invest with states and territories in shared enabling infrastructure that can serve multiple processors or future industries. The same approach would be used to develop other Australian mineral value chains where shared infrastructure is the barrier to further domestic processing.

Investment and system interaction

Novel separation, metallisation, or advanced-material processes facing unresolved technical or industrial scale-up risk would progress through the unified innovation-commercialisation pathway. Proven commercial operations would instead rely on private investment and appropriate industrial-finance institutions.

Individual processing businesses would remain responsible for establishing credible feedstock arrangements, customers, and commercially sustainable operations. Public investment in the processing node would not protect producers from ordinary commodity, technology, or market risk.

Public support would be staged with downstream expansion rather than committed to the entire value chain upfront.

Residual trade-offs

Shared infrastructure is long-lived while mineral markets and processing technologies can change quickly. Even with multiple users, staged investment, and credible customer demand, infrastructure built for a processing node could become underused if the industries it supports later lose their competitive position. However, Portland's deep-water port, major electricity connection, rail access, established metallurgical workforce, and access to scalable open-ocean desalination make it a strong location for alternative industries that could reuse that infrastructure if mineral-processing demand declines.

References

Resources Victoria — Donald Mineral Sands Project | Resources Victoria — Avonbank Mineral Sands Project | Port of Portland — Port Storage & Facilities | Glenelg Shire Council — Portland Industrial Investment Prospectus | Geoscience Australia — Australia's Identified Mineral Resources 2025: Commodity Summaries | ANSTO — Minerals Capability Statement | Australian Energy Market Operator — Heywood to Alcoa Portland 500 kV transmission line | Victorian Government — About Victoria's rail freight network | Australian Strategic Materials — The Dubbo Project

Member ballot

Not yet open
What you’re deciding

Build an advanced zirconium and hafnium processing industry at Portland for high-value refining, using shared infrastructure and a strategic-processing-node model that can be applied to other mineral value chains.

Review commitments
Ballot record

Wording: Draft wording (no ballot yet)

Formal voting has not opened yet. Join the discussion or propose a wording amendment while this proposal is in deliberation.

Your vote is identifiable to national administrators and authorised national ballot reviewers. Aggregate results are public; a very small ballot may reveal individual choices. Privacy Policy

Formal amendments

0

Suggest exact changes to a title, summary, commitment or rationale paragraph. Voting on an amendment is separate from voting on the main proposal.

No formal amendments have been proposed yet.

Discussion

0 contributions

Share evidence, ask a question or suggest an improvement. Discussion scores do not count as ballot votes.

Have a perspective on this proposal?

Verified members can sign in to comment or vote on contributions.

Sign in to participate

No contributions yet. Verified members can start the discussion using the form above.

Wording history and sources

1 snapshot

See how the wording has changed and which version was put to a ballot. References below provide background; they do not by themselves establish prior adoption.

  1. Original recorded wording · 27 Oct 2026legacy-3Latest
    27 Oct 2026 · Initial wording

Policy background and sources

References to earlier policy and notes about what is known of its history.

Flagged 'New' in static export · Lineage unverified

Badged 'New — pending AGM vote' in the Reclaim static export (/pending-vote/), but outside the 36-policy AGM Round 1 lineage dataset.

Scrutiny note: No clause-by-clause audit against prior approved Fusion policy pages has been recorded in the repository for this domain.