Welcome data centres and AI infrastructure where they benefit Victoria—but make major facilities carry the additional power, water, infrastructure and environmental costs they create, and subject them to transparent assessment and genuine community consultation.

Adopted byFusion VictoriaApplies toFusion VictoriaIn force since2 October 2026
Sign in to propose a changeAmend, replace or repeal this policy through a member proposal.

Adopted by the Fusion Victoria executive before this record was imported into Engage. Source: the original published policy ↗.

Key commitments
  • Bring new power with new demand
  • Protect drinking water
  • Assess major facilities as major facilities
  • Enforce environmental limits
  • Use evidence-based siting rules
  • Protect data and critical infrastructure
  • Publish what they actually use
Policy detail

A facility that can consume hundreds of megawatts should not be regulated like another warehouse.

Welcome data centres and AI infrastructure where they benefit Victoria—but make major facilities carry the additional power, water, infrastructure and environmental costs they create, and subject them to transparent assessment and genuine community consultation.

What it does

  • Bring new power with new demand — Require large facilities to match material new electricity demand with additional renewable generation and firming or storage, and pay attributable grid connection and network-upgrade costs.
  • Protect drinking water — Prioritise recycled, non-potable and low-water cooling. Major facilities should not displace household or agricultural access to scarce water, and developers should fund infrastructure upgrades their demand requires.
  • Assess major facilities as major facilities — Set clear scale thresholds for mandatory impact assessment and public consultation covering energy, water, noise, air emissions, traffic, emergency risk, land use and environmental impacts rather than treating hyperscale facilities like ordinary warehouses.
  • Enforce environmental limits — Require containment of contaminated runoff and compliance with enforceable noise, air, waste and pollution limits, backed by regulator powers proportionate to serious or repeated breaches.
  • Use evidence-based siting rules — Keep major facilities out of inappropriate residential and sensitive locations and require adequate separation where impacts warrant it. Do not impose an arbitrary universal kilometre buffer where site-specific evidence supports a better standard.
  • Protect data and critical infrastructure — Apply strong privacy, cybersecurity, resilience and data-sovereignty requirements appropriate to the sensitivity and criticality of the workloads hosted.
  • Publish what they actually use — Require major facilities to report material electricity and water consumption and compliance data so promised safeguards can be tested against real operation.

Design Rationale

This policy regulates measurable externalities rather than treating data centres or AI as inherently good or bad. Requirements scale with facility impact. It avoids a blanket moratorium and avoids arbitrary universal distance rules: siting, separation and mitigation should follow demonstrated risk, while genuinely major projects receive major-project scrutiny.

System Interaction

Victoria already regulates data centres through the planning system and general environmental obligations, with some facilities triggering EPA permissions for activities such as significant on-site power generation. This policy adds a coherent state framework across planning, electricity, water, environment and community consultation rather than relying on fragmented case-by-case treatment.

Economic & Institutional Logic

Data centres provide digital infrastructure, investment and capability, but very large facilities can impose substantial marginal costs on electricity networks, water systems, roads and surrounding communities. Requiring proponents to internalise attributable costs reduces cross-subsidy by households while allowing projects whose benefits justify their impacts to proceed.

Risk & Failure Modes

Poorly designed rules could freeze useful investment, encourage accounting games around renewable procurement, or impose the same burden on small facilities as hyperscale campuses. Thresholds should therefore be measurable and technology-neutral; additional generation claims should demonstrate genuine additionality; and reporting should allow compliance to be audited.

Evidence & Precedent

Victoria's 2026 Sustainable Data Centre Action Plan already recognises data centres as essential infrastructure while introducing expectations around additional renewable generation and storage, network costs, non-drinking water and siting. Existing Victorian applications include facilities with ultimate power capacity in the hundreds of MVA, demonstrating why scale-sensitive rules are warranted.

Implementation Outline

Define major-facility thresholds using power demand and other material impacts; require integrated planning, water, grid, environmental and emergency assessments above those thresholds; establish transparent consultation requirements; set developer-pays rules for attributable infrastructure; specify additional-energy and water standards; and publish ongoing operational compliance data.

What it costs

Low direct budget cost; regulatory and assessment costs should primarily be recovered from proponents.

Paid for by

Proponent fees and developer contributions should recover attributable assessment and infrastructure costs.

Imported wording revision: rev-vic-set-the-rules-for-data-centres-e695d3c6b079

Adoption record and sources
Policy identifier
vic-set-the-rules-for-data-centres
How it was adopted
Imported from Imported from Fusion Party Victoria; adopted by the branch executive.
Source proposal
No source proposal recorded.
Ballot result
No Engage ballot recorded
Authority
Fusion Victoria
Decision event
Not recorded
Ratified
Not ratified through Engage
Effective
2 October 2026
Published
15 November 2026
Provenance
Imported from Fusion Party Victoria
Import basis
Adopted by the Victorian branch executive. Confirmed by the Engage maintainer on 2026-11-15 that all live Victorian branch policies are ratified and adopted.
Imported
15 November 2026
Source record
set-the-rules-for-data-centres
Adopted amendments
None recorded
Published wording revisions
rev-vic-set-the-rules-for-data-centres-e695d3c6b079
← Fusion Victoria policy