Welcome data centres and AI infrastructure where they benefit Victoria—but make major facilities carry the additional power, water, infrastructure and environmental costs they create, and subject them to transparent assessment and genuine community consultation.
Adopted by the Fusion Victoria executive before this record was imported into Engage. Source: the original published policy ↗.
- Bring new power with new demand
- Protect drinking water
- Assess major facilities as major facilities
- Enforce environmental limits
- Use evidence-based siting rules
- Protect data and critical infrastructure
- Publish what they actually use
A facility that can consume hundreds of megawatts should not be regulated like another warehouse.
Welcome data centres and AI infrastructure where they benefit Victoria—but make major facilities carry the additional power, water, infrastructure and environmental costs they create, and subject them to transparent assessment and genuine community consultation.
What it does
- Bring new power with new demand — Require large facilities to match material new electricity demand with additional renewable generation and firming or storage, and pay attributable grid connection and network-upgrade costs.
- Protect drinking water — Prioritise recycled, non-potable and low-water cooling. Major facilities should not displace household or agricultural access to scarce water, and developers should fund infrastructure upgrades their demand requires.
- Assess major facilities as major facilities — Set clear scale thresholds for mandatory impact assessment and public consultation covering energy, water, noise, air emissions, traffic, emergency risk, land use and environmental impacts rather than treating hyperscale facilities like ordinary warehouses.
- Enforce environmental limits — Require containment of contaminated runoff and compliance with enforceable noise, air, waste and pollution limits, backed by regulator powers proportionate to serious or repeated breaches.
- Use evidence-based siting rules — Keep major facilities out of inappropriate residential and sensitive locations and require adequate separation where impacts warrant it. Do not impose an arbitrary universal kilometre buffer where site-specific evidence supports a better standard.
- Protect data and critical infrastructure — Apply strong privacy, cybersecurity, resilience and data-sovereignty requirements appropriate to the sensitivity and criticality of the workloads hosted.
- Publish what they actually use — Require major facilities to report material electricity and water consumption and compliance data so promised safeguards can be tested against real operation.
Design Rationale
This policy regulates measurable externalities rather than treating data centres or AI as inherently good or bad. Requirements scale with facility impact. It avoids a blanket moratorium and avoids arbitrary universal distance rules: siting, separation and mitigation should follow demonstrated risk, while genuinely major projects receive major-project scrutiny.
System Interaction
Victoria already regulates data centres through the planning system and general environmental obligations, with some facilities triggering EPA permissions for activities such as significant on-site power generation. This policy adds a coherent state framework across planning, electricity, water, environment and community consultation rather than relying on fragmented case-by-case treatment.
Economic & Institutional Logic
Data centres provide digital infrastructure, investment and capability, but very large facilities can impose substantial marginal costs on electricity networks, water systems, roads and surrounding communities. Requiring proponents to internalise attributable costs reduces cross-subsidy by households while allowing projects whose benefits justify their impacts to proceed.
Risk & Failure Modes
Poorly designed rules could freeze useful investment, encourage accounting games around renewable procurement, or impose the same burden on small facilities as hyperscale campuses. Thresholds should therefore be measurable and technology-neutral; additional generation claims should demonstrate genuine additionality; and reporting should allow compliance to be audited.
Evidence & Precedent
Victoria's 2026 Sustainable Data Centre Action Plan already recognises data centres as essential infrastructure while introducing expectations around additional renewable generation and storage, network costs, non-drinking water and siting. Existing Victorian applications include facilities with ultimate power capacity in the hundreds of MVA, demonstrating why scale-sensitive rules are warranted.
Implementation Outline
Define major-facility thresholds using power demand and other material impacts; require integrated planning, water, grid, environmental and emergency assessments above those thresholds; establish transparent consultation requirements; set developer-pays rules for attributable infrastructure; specify additional-energy and water standards; and publish ongoing operational compliance data.
What it costs
Low direct budget cost; regulatory and assessment costs should primarily be recovered from proponents.
Paid for by
Proponent fees and developer contributions should recover attributable assessment and infrastructure costs.
Imported wording revision: rev-vic-set-the-rules-for-data-centres-e695d3c6b079
Adoption record and sources
- Policy identifier
vic-set-the-rules-for-data-centres- How it was adopted
- Imported from Imported from Fusion Party Victoria; adopted by the branch executive.
- Source proposal
- No source proposal recorded.
- Ballot result
- No Engage ballot recorded
- Authority
- Fusion Victoria
- Decision event
- Not recorded
- Ratified
- Not ratified through Engage
- Effective
- 2 October 2026
- Published
- 15 November 2026
- Provenance
- Imported from Fusion Party Victoria
- Import basis
- Adopted by the Victorian branch executive. Confirmed by the Engage maintainer on 2026-11-15 that all live Victorian branch policies are ratified and adopted.
- Imported
- 15 November 2026
- Source record
set-the-rules-for-data-centres- Adopted amendments
- None recorded
- Published wording revisions
rev-vic-set-the-rules-for-data-centres-e695d3c6b079