Connect the Regions
Victoria's regional network is built entirely hub-and-spoke through Melbourne. A Ballarat resident travelling to Bendigo has to route via the city despite the two being roughly 100km apart directly. Commission a direct regional cross-connectivity study for major regional-to-regional pairs currently requiring a Melbourne detour.
Adopted by the Fusion Victoria executive before this record was imported into Engage. Source: the original published policy ↗.
- Regional Victoria isn't a Melbourne feeder
- Ballarat to Bendigo, the test case
- A scoping study, not a blank cheque
Want to get from Ballarat to Bendigo, two of Victoria's biggest regional cities about 100km apart, without a car? The only way DTP has built is via Melbourne.
Victoria's regional network is built entirely hub-and-spoke through Melbourne. A Ballarat resident travelling to Bendigo has to route via the city despite the two being roughly 100km apart directly. Commission a direct regional cross-connectivity study for major regional-to-regional pairs currently requiring a Melbourne detour.
What it does
- Regional Victoria isn't a Melbourne feeder — Every V/Line and coach route is designed around getting people to and from Melbourne, not between regional centres.
- Ballarat to Bendigo, the test case — Two of Victoria's largest regional cities, roughly 100km apart directly, have no direct public transport connection at all.
- A scoping study, not a blank cheque — This is a commitment to find out what direct regional links would cost and where they'd have the most impact, not a pre-committed spend.
Design Rationale
A scoping study is the deliverable this term rather than a funded build, because the specific cost and alignment of direct regional-to-regional services isn't known. DTP has never studied it, because the network was never designed around that question. Naming a study rather than a project avoids overpromising on figures that don't exist yet, while still forcing the question onto the public record.
System Interaction
V/Line operates the regional rail network and coach replacement services under its existing franchise arrangements; any new direct regional-to-regional service would need to interact with existing rolling stock allocation, track access agreements (much of regional track is shared with freight), and V/Line timetabling systems.
Economic & Institutional Logic
Hub-and-spoke design made sense when Melbourne was the overwhelming destination for regional travel; as regional centres grow in their own right, demand for direct regional-to-regional travel grows independent of Melbourne, and the current network structurally cannot serve it without a Melbourne detour that adds hours to trips a direct link could complete quickly.
Risk & Failure Modes
The primary risk is that a scoping study is commissioned and then shelved without a funding pathway. That's the same failure mode already seen with Infrastructure Victoria's City Loop recommendation. A firm reporting deadline and public release requirement should be attached to the study commission to reduce this risk.
Evidence & Precedent
Infrastructure Victoria and V/Line planning documents to date have focused overwhelmingly on Melbourne-radial services; no equivalent regional cross-connectivity study currently exists for Victoria, despite comparable regional rail systems overseas demonstrating demand for non-hub regional links where population centres are large enough to support them.
Implementation Outline
Sequence 1: Commission a direct regional cross-connectivity study covering major regional-to-regional pairs currently requiring a Melbourne detour, starting with Ballarat–Bendigo. Sequence 2: Require the study to assess both V/Line rail and coach options against cost and demand. Sequence 3: Publish the findings and recommended priority order publicly, with a fixed reporting deadline.
What it costs
TBD. Needs a scoping study.
Paid for by
The study itself is a modest departmental commissioning cost; any resulting service build would be costed and funded separately once the study reports, not committed to in advance.
Imported wording revision: rev-vic-connect-the-regions-164f41b49f72
Adoption record and sources
- Policy identifier
vic-connect-the-regions- How it was adopted
- Imported from Imported from Fusion Party Victoria; adopted by the branch executive.
- Source proposal
- No source proposal recorded.
- Ballot result
- No Engage ballot recorded
- Authority
- Fusion Victoria
- Decision event
- Not recorded
- Ratified
- Not ratified through Engage
- Effective
- 22 July 2026
- Published
- 15 November 2026
- Provenance
- Imported from Fusion Party Victoria
- Import basis
- Adopted by the Victorian branch executive. Confirmed by the Engage maintainer on 2026-11-15 that all live Victorian branch policies are ratified and adopted.
- Imported
- 15 November 2026
- Source record
connect-the-regions- Adopted amendments
- None recorded
- Published wording revisions
rev-vic-connect-the-regions-164f41b49f72