Current policyReclaim our infrastructureBuild the Network

Connect the Regions

Victoria's regional network is built entirely hub-and-spoke through Melbourne. A Ballarat resident travelling to Bendigo has to route via the city despite the two being roughly 100km apart directly. Commission a direct regional cross-connectivity study for major regional-to-regional pairs currently requiring a Melbourne detour.

Adopted byFusion VictoriaApplies toFusion VictoriaIn force since22 July 2026
Sign in to propose a changeAmend, replace or repeal this policy through a member proposal.

Adopted by the Fusion Victoria executive before this record was imported into Engage. Source: the original published policy ↗.

Key commitments
  • Regional Victoria isn't a Melbourne feeder
  • Ballarat to Bendigo, the test case
  • A scoping study, not a blank cheque
Policy detail

Want to get from Ballarat to Bendigo, two of Victoria's biggest regional cities about 100km apart, without a car? The only way DTP has built is via Melbourne.

Victoria's regional network is built entirely hub-and-spoke through Melbourne. A Ballarat resident travelling to Bendigo has to route via the city despite the two being roughly 100km apart directly. Commission a direct regional cross-connectivity study for major regional-to-regional pairs currently requiring a Melbourne detour.

What it does

  • Regional Victoria isn't a Melbourne feeder — Every V/Line and coach route is designed around getting people to and from Melbourne, not between regional centres.
  • Ballarat to Bendigo, the test case — Two of Victoria's largest regional cities, roughly 100km apart directly, have no direct public transport connection at all.
  • A scoping study, not a blank cheque — This is a commitment to find out what direct regional links would cost and where they'd have the most impact, not a pre-committed spend.

Design Rationale

A scoping study is the deliverable this term rather than a funded build, because the specific cost and alignment of direct regional-to-regional services isn't known. DTP has never studied it, because the network was never designed around that question. Naming a study rather than a project avoids overpromising on figures that don't exist yet, while still forcing the question onto the public record.

System Interaction

V/Line operates the regional rail network and coach replacement services under its existing franchise arrangements; any new direct regional-to-regional service would need to interact with existing rolling stock allocation, track access agreements (much of regional track is shared with freight), and V/Line timetabling systems.

Economic & Institutional Logic

Hub-and-spoke design made sense when Melbourne was the overwhelming destination for regional travel; as regional centres grow in their own right, demand for direct regional-to-regional travel grows independent of Melbourne, and the current network structurally cannot serve it without a Melbourne detour that adds hours to trips a direct link could complete quickly.

Risk & Failure Modes

The primary risk is that a scoping study is commissioned and then shelved without a funding pathway. That's the same failure mode already seen with Infrastructure Victoria's City Loop recommendation. A firm reporting deadline and public release requirement should be attached to the study commission to reduce this risk.

Evidence & Precedent

Infrastructure Victoria and V/Line planning documents to date have focused overwhelmingly on Melbourne-radial services; no equivalent regional cross-connectivity study currently exists for Victoria, despite comparable regional rail systems overseas demonstrating demand for non-hub regional links where population centres are large enough to support them.

Implementation Outline

Sequence 1: Commission a direct regional cross-connectivity study covering major regional-to-regional pairs currently requiring a Melbourne detour, starting with Ballarat–Bendigo. Sequence 2: Require the study to assess both V/Line rail and coach options against cost and demand. Sequence 3: Publish the findings and recommended priority order publicly, with a fixed reporting deadline.

What it costs

TBD. Needs a scoping study.

Paid for by

The study itself is a modest departmental commissioning cost; any resulting service build would be costed and funded separately once the study reports, not committed to in advance.

Imported wording revision: rev-vic-connect-the-regions-164f41b49f72

Adoption record and sources
Policy identifier
vic-connect-the-regions
How it was adopted
Imported from Imported from Fusion Party Victoria; adopted by the branch executive.
Source proposal
No source proposal recorded.
Ballot result
No Engage ballot recorded
Authority
Fusion Victoria
Decision event
Not recorded
Ratified
Not ratified through Engage
Effective
22 July 2026
Published
15 November 2026
Provenance
Imported from Fusion Party Victoria
Import basis
Adopted by the Victorian branch executive. Confirmed by the Engage maintainer on 2026-11-15 that all live Victorian branch policies are ratified and adopted.
Imported
15 November 2026
Source record
connect-the-regions
Adopted amendments
None recorded
Published wording revisions
rev-vic-connect-the-regions-164f41b49f72
← Fusion Victoria policy