Build the Melton Line

Quadruplicate the rail corridor between Melton and Sunshine to give Melton its own dedicated, electrified metro line, instead of sharing track with V/Line's diesel regional services to Ballarat, to match the pace of growth in Melbourne's outer west.

Adopted byFusion VictoriaApplies toFusion VictoriaIn force since26 June 2026
Sign in to propose a changeAmend, replace or repeal this policy through a member proposal.

Adopted by the Fusion Victoria executive before this record was imported into Engage. Source: the original published policy ↗.

Key commitments
  • Quadruplicate Melton to Sunshine
  • Electrify the dedicated line
  • Reduced highway gridlock
  • Close the 800m bus gap next door
Policy detail

Melton has over 200,000 residents. Their peak-hour service still runs diesel because Melton's own track has never been electrified, unlike the neighbouring Sunbury line, and it's shared with V/Line's regional Ballarat services, capping both frequency and capacity.

Quadruplicate the rail corridor between Melton and Sunshine to give Melton its own dedicated, electrified metro line, instead of sharing track with V/Line's diesel regional services to Ballarat, to match the pace of growth in Melbourne's outer west.

What it does

  • Quadruplicate Melton to Sunshine — Add two dedicated tracks between Melton and Sunshine so Melton's own metro service is no longer forced to share track, and share delays, with V/Line's regional Ballarat trains.
  • Electrify the dedicated line — Separated from the shared corridor, Melton's own track can finally be electrified and run HCMT, the same high-capacity metro train already operating on the neighbouring Sunbury line, carrying roughly three times the passengers of today's 6-car VLocity, rather than diesel stock built for seated regional trips.
  • Reduced highway gridlock — Providing high-capacity transit relieves pressure on the Western Highway.
  • Close the 800m bus gap next door — Route 454 and Route 140 are delivered, but Strathtulloh, Rockbank, Deanside and Fraser Rise, still have populations with no bus stop within 800 metres. The same coverage gap repeats across growth areas in Melbourne's south-east and north.

Design Rationale

Frequency and rolling stock are the binding constraints on this corridor, not train length. The $650 million Melton Line Upgrade's nine-car VLocity trains deliver a 50% capacity gain over today's 6-car peak service, but VLocity is a seated regional design. A dedicated, electrified Melton line using metro-standard rolling stock resolves the structural capacity and frequency constraints rather than requiring the same problem to be re-argued each budget cycle. The corridor is not an untouched project site: the Melton Line Upgrade undertook site investigations in 2025, including ground-condition and soil testing, while current electrification development work is already carrying out feature surveys, utility mapping, environmental assessments, planning work and detailed design. The Cobblebank stabling yard is also being future-proofed for Metro trains. The delivery principle should therefore be to reuse existing corridor investigations and design data wherever they remain fit for purpose, identify only the genuine evidence gaps, and move from development work to a funded delivery decision rather than repeatedly commissioning broad feasibility work for the same established need. Melton is one of Melbourne's fastest-growing local government areas. Infrastructure Victoria's 2025 strategy also identifies a Melton-to-Broadmeadows BRT corridor as a separate complementary project; that should not substitute for the rail capacity problem itself.

System Interaction

The existing Melton line is operated entirely by V/Line under its own state passenger rail contract: a regional diesel service, not a metropolitan one, sharing track with V/Line's own Ballarat regional services. No metro operator is involved today. Quadruplicating the corridor between Melton and Sunshine requires new track, platform work at affected stations, coordinated planning with V/Line, and approvals under the Major Transport Projects Facilitation Act 2009. Electrifying the separated Melton track would bring the corridor into Metro Trains Melbourne's network for the first time (Metro's own contract currently runs to November 2027), letting HCMT, the fleet already operating on the Sunbury line, extend service to Melton without requiring a new rolling stock type or a separate maintenance regime. The Melton-to-Broadmeadows BRT corridor is a separate Infrastructure Victoria recommendation worth pursuing on its own timeline, but it is not the same project as quadruplicating and electrifying the Melton line itself, and should not be substituted for it. The Transit Development District mechanism, declaring the Melton BRT corridor terminus a TDD, remains VWHF's tool for anchoring residential and commercial development to that separate transit endpoint.

Economic & Institutional Logic

Quadruplication is capital-intensive but structurally solves the shared-track constraint permanently, rather than requiring repeated bus-service top-ups to compensate for a corridor that was never designed to carry current demand. VAGO's 2013 growth-area transport audit identified a roughly $197 million per year recurrent funding gap for bus services in Melbourne's growth areas, within a broader infrastructure and service backlog north of $10 billion. That gap keeps recurring because the underlying rail constraint is never fixed. RMIT University's 2024 research found that across Melbourne, apartment numbers grew 88% between 2004 and 2022 while public transport services within walking distance grew just 5%. For the separate Melton-to-Broadmeadows BRT corridor, the Transit Capital Fund's surcharge revenue and VWHF's station-precinct development income at the corridor's termini are the intended funding sources, not general government borrowing.

Risk & Failure Modes

The main delivery risk is replacing one round of planning with another without reaching a construction decision. Existing investigation data should be reused where technically valid, but that does not mean every future survey is redundant: electrification, additional tracks, power supply, drainage, signalling, property acquisition and environmental approvals can require project-specific work. The safeguard is a published evidence-gap register showing what information already exists, what new work is genuinely required and why. A second risk is allowing the $650 million Melton Line Upgrade and nine-car VLocity program to be presented as a substitute for the frequency and operating-model changes electrification is intended to enable. Interim bus improvements should likewise be treated as complementary rather than as a reason to defer the rail decision.

Evidence & Precedent

East Pakenham station, opened in June 2024, extended dedicated metropolitan track by two kilometres specifically to stop V/Line Gippsland services queuing behind Metro trains turning back at the end of the line. It's a smaller-scale precedent than quadruplicating the entire Melton-Sunshine corridor, but it confirms Victoria has already built exactly this kind of metro/V-Line track separation, and recently. HCMT already operates on the neighbouring Sunbury line, the electrified corridor Melton's own line has never been connected to, so extending that same, already-proven fleet to an electrified Melton line requires no new rolling stock type, only the electrification and quadruplication works this policy specifies. VAGO's June 2026 Bus Plan audit put Melton at 9-12% of its population within reach of high-quality public transport of any kind. Cardinia sits below 1%, Casey at 9-12%, Hume and Whittlesea at 21-24%. Inside Melton, the Rockbank-Mt Cottrell area, one of five outer metropolitan communities with a population over 30,000, has no high-quality public transport within 800 metres at all. The Bus Bonanza's $100 million for Melton South, Route 454, and Route 140 is the state's own confirmation that this gap is real and has been under-resourced for years.

Implementation Outline

Sequence 1: Complete the already-funded Melton Line Electrification development work now under way, publish the resulting scope, cost range, power-supply requirements, land needs and delivery risks, and reuse the Melton Line Upgrade's existing surveys, geotechnical investigations, utility mapping and station design data wherever they remain fit for purpose. Do not commission another broad feasibility study merely to restate the need for electrification. Sequence 2: Make a funded delivery decision for electrification and the additional track capacity required between Melton and Sunshine, with any genuinely new investigations limited to unresolved engineering, environmental or property questions. Sequence 3: Deliver the already-funded interim bus improvements and publish actual start dates and frequencies so residents are not asked to wait for the rail project alone. Sequence 4: Progress the separate Melton-to-Broadmeadows BRT corridor on its own evidence and timetable rather than using it as a substitute for electrification or dedicated rail capacity.

What it costs

Rail corridor, stations, rolling stock and operations require independent appraisal

Paid for by

Develop a staged business case with capacity, land, construction and operating costs before committing a funding mix.

Imported wording revision: rev-vic-build-the-melton-line-704af31f0217

Adoption record and sources
Policy identifier
vic-build-the-melton-line
How it was adopted
Imported from Imported from Fusion Party Victoria; adopted by the branch executive.
Source proposal
No source proposal recorded.
Ballot result
No Engage ballot recorded
Authority
Fusion Victoria
Decision event
Not recorded
Ratified
Not ratified through Engage
Effective
26 June 2026
Published
15 November 2026
Provenance
Imported from Fusion Party Victoria
Import basis
Adopted by the Victorian branch executive. Confirmed by the Engage maintainer on 2026-11-15 that all live Victorian branch policies are ratified and adopted.
Imported
15 November 2026
Source record
build-the-melton-line
Adopted amendments
None recorded
Published wording revisions
rev-vic-build-the-melton-line-704af31f0217
← Fusion Victoria policy